Bonjour to all!
Thus begins hopefully a long stay with Lorie Line Music as a Front of House Engineer! I have already begun with the pre-tour preparations of getting the tour on the road; including verifying that all equipment works and that everything that is needed for this tour is present and accounted for. I have another (mere) two weeks to ensure that everything is ready to go and all systems are a-okay before my first show on the 18th in Bradeton, Fl. Yes, this means that I will be able to receive a much needed break from the harsh Minnesota weather!
Subscribe to:
Post Comments (Atom)
Ted, this is pretty cool! I like the blog!
ReplyDelete-Kelly P.